By 1994, work on the 4th Republic Road (as it was then known) extended the grated motorable road from Kanka to Nyire. View to the west on the approach to Kanka, Banda mountain range visible in the distance. July, 1994.
View from the north edge of Ahenkro of the road leading northward to Bongase and the Bui Dam site. Newly installed electricty poles and wires are visible on the roadside. Ahenkro, June, 2008.
Newly grated and guttered road leading northward from Ahenkro toward Bongase viewed from the north edge of Ahenkro. The Banda hills are visible in the background. July, 1994
View to the north on the Bongase road, roughly 4 km southwest of Bongase. Electrical poles and wires run alongside the main road. The low-lying area of the road (ahead in the picture) was inundated by flood waters as the lake formed behind Bui Dam after 2013. A bypass had to be constructed and the road here became passable after the 2013 formation of Bui Lake only by a narrow foot bridge. June, 2009.
View to the south on the Bongase road, roughly 3 km southwest of Bongase, with Banda hills visible to the right. The low area (ahead in the road) was inundated by flood waters as the lake formed behind Bui Dam after 2013. A bypass had to be constructed as this road became passable only by a narrow foot bridge. 12 June, 2009.
View from the north edge of Ahenkro of the road leading northward to Bongase and the Bui Dam site. Electricty poles and wires are visible on the roadside. The newly grated road of a year before has suffered erosion in the intervening rainy season. Ahenkro, June, 2009.
Recently paved road connecting Ahenkro with the Wenchi-Bamboi road (N12) via Kanka. Photo taken in-between Nyire and the Kanka traffic circle leading to Ahenkro. 9 July, 2011.
View to the south on the Bongase road, roughly 1.7 km west of Bongase. The peak known as 'Chuli' is visible in mountain range to the right. 12 June, 2009.