A water level measurement pole (bottom right) at the base of a path through riparian forest leading to the Bui Dam site on the Black Volta River. These measuring devices were placed when Soviet engineers began laying groundwork for the dam under Nkrumah's government. On the other side of the river is the mountainside against which the dam was later built, beginning in 2008. View towards north. Bui Dam site, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation
Subjects Facet:
Bui Dam (Ghana); Riparian forests; Black Volta River
Yaw Kyԑ paddles a canoe toward the Dam Site settlement, an Ewe fishing village on the south bank of the Black Volta River. Canoes like these were used to ferry people across the river and for fishing. In the foreground, a basket sits on the riverbank. The mountain in the background (looking northward) is the site where the Bui Dam was built, beginning in 2008. Dam Site settlement, June, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Baskets; Canoes; Riparian forests; Black Volta River; Fishing
Black Volta River at the Dam Site settlement, an Ewe fishing village immediately downstream of the Bui Dam site. View from the south bank across the river toward riparian woodland on the river's north bank. Dam Site settlement, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Riparian forests; Black Volta River
Yaw Kyԑ paddles a canoe toward Bui Dam settlement, an Ewe fishing village on the south bank of the Black Volta River. A path leading to the fishing village of Agbegikrom on the river's opposite bank is visible (center, right). Canoes like these were used to ferry people across the river and for fishing. The mountain in the background (looking northward) is the site where the Bui Dam was built, beginning in 2008. Bui Dam settlement, June, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Canoes; Riparian forests; Black Volta River; Fishing
Villages of Ewe families who made their livelihood through fishing lined the banks of the Black Volta River on its northern and southern shores during the 20th century. Viewed here from the south bank, looking northward from Agbegikrom South, is the fishing village of Agbegikrom North. Because their homes were located a short distance downstream from the site of Bui Dam, villagers in both settlements were relocated beginning in 2008 as construction on the dam began. Agbegikrom North, 7 October, 1982.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Agbegikrom North
Subjects:
Relocation
Subjects Facet:
Bui Dam (Ghana); Black Volta River; Fishing villages; Ewe (African people); Housing
Standing on the south bank of the Black Volta River near Bui Village, looking east-northeast to the gap in the Banda hills where the Bui Dam was constructed. The area between Bui village and the river was the site of a 19th-century village (Bui Kataa or old Bui). This area was flooded by the rising waters of Bui Lake as it formed behind Bui Dam after 2012. Bui, 25 July, 1982.
Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here a road is being constructed along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here the river channel has been diverted and the base of the dam is under construction. View from the south bank, looking northwest. Two photos. Bui Dam site, 7 July, 2009.
Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here a road is being constructed along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
Standing on the south bank of the Black Volta River near Bui Village, looking north-northwest. Thick riparian forest is visible on the river's north bank. The area between Bui Village and the river was the site of a 19th-century village, Bui Kataa. This area was flooded by the rising waters of Bui Lake as it formed behind Bui Dam after 2012. Bui, 7 June, 2008.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Bui
Subjects:
Bui Lake; Bui Kataa; Savanna woodland; Vegetation
Subjects Facet:
Bui Dam (Ghana); Landscapes; Riparian forests; Black Volta River; Mountains