Bridge spanning the Tombԑ River near Sabiye on the road from Menji to Ahenkro, view to the south. Construction of a replacement bridge began in the 2010s but was stalled by 2016. As of 2019, this bridge remained the main connection to southern towns traveling from Banda. Two photos. Sabiye, 19 June, 2016.
Construction of a new bridge to replace a long-used one over the Tombԑ River near Sabiye on the road from Menji to Ahenkro began in the 2010s. Its abutments are visible here, view to the north. Construction had stalled by 2016. Sabiye, 19 June, 2016.
View to the south on the old Bongase road, Banda hills to the right, roughly 3 km southwest of Bongase. The low area (ahead in the road) was inundated by flood waters as the lake formed behind Bui Dam after 2012. A bypass has been constructed and the road here now passable only by a narrow foot bridge. 18 June, 2016.