Number of results to display per page
Search Results
41. Westward view from Banda hills, 2009
- Description:
- Looking west from the Banda rockshelter, the view encompasses land that since 1971 has been part of Bui National Park, a Wildlife Protected Area covering more than 1800 km2. Prior to that, these lands west of the Banda hills were important to local people as a source of "bush meat." Archaeological evidence suggests that for centuries hunting was provided an important food source for Banda peoples. This is the fifth of eight images in a south-to-north panorama from this viewpoint. hills, 28 June, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17035 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17032 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17036 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17030 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17033 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17031 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17037
- Location(s) Facet:
- Banda
- Subjects:
- Hunting; Bui National Park; Savanna woodland; Vegetation
- Subjects Facet:
- Landscapes; Mountains
- Identifier:
- 5/8
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-06-28
- Genre Facet:
- Digital image
- Location(s):
- Banda;8.179543, -2.371213
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.179543, -2.371213
42. Downstream from Bui Dam construction site, 2009
- Description:
- In the foreground, right, work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Grating of the mountain slope is underway. Beyond that (right center) buildings associated with the Chinese operational site are visible. The braided channel of the Black Volta River downstream from the dam site is center frame. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17039 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17049
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Landscapes; Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098
43. Construction at the Bui Dam site, 2009
- Description:
- Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here they grate the southern mountain that will serve as part of the dam's infrastructure. To the left, the cleared site of the former Ewe fishing village of Agbegikrom is visible. Looking downstream, the braiding of the Black Volta River below the dam site is visible. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17041
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro
- Subjects Facet:
- Bui Dam (Ghana); Black Volta River; Fishing villages; Mountains; Ewe (African people)
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098
44. Construction at the Bui Dam site, 2009
- Description:
- Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here standing on the south bank looking northwest with a view of the diversion channel and the base of the dam under construction. The Bui National Park lands in the background were flooded by Bui Lake as it formed behind the dam from 2012. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro; Bui National Park; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Landscapes; Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098
45. Temporary bridge over Black Volta River, Bui Dam site, 2009
- Description:
- A temporary bridge spans the Black Volta River at the site where Sinohydro, a state-owned Chinese hydropower engineering and construction company began constructing the Bui Hydroelectric Dam in 2008. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Bui
- Subjects:
- Sinohydro; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Bridges; Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre Facet:
- Digital image
- Location(s):
- Bui;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098
46. Bui Dam in construction, 2009
- Description:
- Sinohydro, the state-owned Chinese hydropower engineering and construction company, began constructing the Bui Hydroelectric Dam in 2008. Here the river's course has been diverted along the south bank as construction of the dam is underway. The land in the background lays within Bui National Park, a Wildlife Protection Area first established in 1971. Following completion of the dam, the area between the dam and the distant mountain was flooded by the newly formed Bui Lake. Viewing the scene, L-R, are Enoch Mensah, Devin Tepleski, unknown dam employeee, Ann B. Stahl and Sampson Attah. Bui Dam site, 7 June, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Bui
- Subjects:
- Bui Lake; Bui National Park; Savanna woodland; Sinohydro; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Landscapes; Mountains; Wildlife refuges
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre Facet:
- Digital image
- Location(s):
- Bui;8.277680, -2.236693
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.277680, -2.236693
47. UVic student Devin Tepleski with children in Bui, 2009
- Description:
- Devin Tepleski, University of Victoria undergraduate student in visual anthropology, plays back film footage on a video camera to children from Bui Village. The children carry headpans as they make their way to the river to fetch water. Acting on a request by Bui people, Tepleski visited Bui as part of the Banda Research Project to video-document the village and its people prior to their mandatory relocation due to the Bui Hydroelectric Dam project. His short film "Mango Driftwood" was posted on YouTube on 20 November, 2010 at the link below. Bui Village, May, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://www.youtube.com/watch?v=Ubmaq_oxwfQ
- Location(s) Facet:
- Bui
- Subjects:
- Headpans; Mango Driftwood; Team photo; Bui; Fetching water; Children's work
- Subjects Facet:
- Bui Dam (Ghana); Visual Anthropology
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl; Devin Tepleski
- Date searchable:
- 2009
- Date searchable:
- 2009-05
- Genre Facet:
- Digital image
- Format:
- Image
- Language Facet:
- English
- Location(s):
- Bui;8.277322, -2.260175
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.277322, -2.260175
48. Archaeological team members, Ngre Kataa, 2009
- Description:
- Members of the 2009 archaeological excavation team at Ngre Kataa. Team members included graduate students from the University of Ghana and North America, a representative of the Ghana Museums and Monuments Board and Banda men from Ahenkro and Nyrie. Back row (L-R): David Adjartey Tei-Mensah, Peter, Frimpong, Enoch Mensah, Yaw Mensah, Yaw Francis, Devin Tepleski. Middle row (L-R): Amanda Logan, Sampson Fordjour, Kofi Paul, Felix Ochra, Yaw Frimpong; J.K. Mensah; Kofi "Photo" Manu; Ann Stahl, Kwakye Eric, Frank, Kofi Nsia; Front, seated (L-R): Abass Iddrisu, Osei Kofi, Andrew Gurstelle (kneeling). 9 July, 2009, Ngre Kataa.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Nyire
- Subjects:
- Team photo; Ngre Kataa
- Subjects Facet:
- Archaeology; Excavations (Archaeology)
- Creator:
- Devin Tepleski
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-08-08
- Genre Facet:
- Digital image
- Format:
- Image
- Location(s):
- Nyire;8.11277778, -2.30611111
- People Facet:
- Devin Tepleski
- Geographic Coordinates:
- 8.11277778, -2.30611111
49. Chief of Nyire visiting Ngre Kataa, 2009
- Description:
- Archaeological team member Enoch Mesah (left, white shirt) explains what archaeologists have been learning through excavation of Mound 7 at Ngre Kataa. He addresses Tolɛɛ Gbankama, chief of Nyire (standing, center, white shirt) and accompanying Nyire elders during a site visit. Archaeological team member Kofi Nsia pauses excavation during the conversation, the short-handled hoe with which he is working resting on the ground in front of him. Ngre Kataa, 6 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Provenance:
- Ngre Kataa, Mound 7
- Location(s) Facet:
- Ngre Kataa
- Subjects:
- Community engagement
- Subjects Facet:
- Archaeology; Excavations (Archaeology)
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-06
- Genre Facet:
- Digital image
- Format:
- Image
- Location(s):
- Ngre Kataa;8.11277778, -2.30611111
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.11277778, -2.30611111
50. Excavations at a metal working area, Ngre Kataa, 2009
- Description:
- Archaeological excavations of Mound 6 at Ngre Kataa in 2009 expose a workshop where blacksmiths produced iron and copper-alloy tools and ornaments. The mound is being excavated in 2 x 2 meter units named for the coordinates of their northeast corner. In unit 50N 0W (foreground), an area of burned soil marks the location where blacksmiths heated metals. A pottery jar sits in place to the right. In surrounding units (50N 2W, 48N 0W, 48N 2W) are large anvil stones where the hot metals would have been hammered and shaped through forging. The mound's stratified deposits suggest that the workshop area was used for many decades, and perhaps centuries, between the years of about 1350 and 1520 CE (Common Era). View across the mound from the northeast looking towards the southwest. Site Ngre Kataa. 27 June, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Provenance:
- Ngre Kataa, Mound 6
- Location(s) Facet:
- Ngre Kataa
- Subjects:
- Workshop; Mound 6
- Subjects Facet:
- Handicraft; Metallurgy; Archaeology; Metalworking; Forging; Excavations (Archaeology); Iron; Copper alloys
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-06-27
- Genre Facet:
- Digital image
- Format:
- Image
- Location(s):
- Ngre Kataa;8.11277778, -2.30611111
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.11277778, -2.30611111









