1. North bank Ewe fishing village, Bui Dam site, 2008
- Description:
- Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here on the north bank of the Black Volta River at the base of the mountain which became the dam site is an Ewe fishing village, Agbegikrom. The village was leveled after its inhabitants were resettled. Two views, one showing a road under construction along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17350
- Location(s) Facet:
- Dam Site
- Subjects:
- Savanna woodland; Sinohydro; Vegetation
- Subjects Facet:
- Ewe (African people); Black Volta River; Fishing villages; Roads; Bui Dam (Ghana); Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2008
- Date searchable:
- 2008-06-28
- Genre:
- ;Digital image
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.276785, -2.235809
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.276785, -2.235809