A new road (the "4th Republic Road") connecting Kanka directly to Ahenkro and bypassing Kabruno was built in about 1993. The newly grated road is seen here from the north side of Kanka, looking northward toward Ahenkro, visible in the distance. June, 1994.
A new road (known in the 1990s as the 4th Republic Road) connected Kanka directly to Ahenkro, first as a grated road and, after completion of Bui Dam, as a paved road. Viewed here from the north edge of Kanka, looking northward, Ahenkro is visible in the distance. 18 June, 2016.
Road leading into Ahenkro from the south with the Banda hills in the background. Two cell phone towers are visible on the south edge of town and electrical power lines run along the east side of the road. The new market building located on the south side of Ahenkro is visible at the point where the road curves in the distance. A motorized three-wheeled car and a motor cycle travel on the road ahead. Ahenkro, 19 June, 2016.