A water level measurement pole (bottom right) at the base of a path through riparian forest leading to the Bui Dam site on the Black Volta River. These measuring devices were placed when Soviet engineers began laying groundwork for the dam under Nkrumah's government. On the other side of the river is the mountainside against which the dam was later built, beginning in 2008. View towards north. Bui Dam site, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation
Subjects Facet:
Bui Dam (Ghana); Riparian forests; Black Volta River
Yaw Kyԑ paddles a canoe toward the Dam Site settlement, an Ewe fishing village on the south bank of the Black Volta River. Canoes like these were used to ferry people across the river and for fishing. In the foreground, a basket sits on the riverbank. The mountain in the background (looking northward) is the site where the Bui Dam was built, beginning in 2008. Dam Site settlement, June, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Baskets; Canoes; Riparian forests; Black Volta River; Fishing
Black Volta River at the Dam Site settlement, an Ewe fishing village immediately downstream of the Bui Dam site. View from the south bank across the river toward riparian woodland on the river's north bank. Dam Site settlement, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Riparian forests; Black Volta River
Yaw Kyԑ paddles a canoe toward Bui Dam settlement, an Ewe fishing village on the south bank of the Black Volta River. A path leading to the fishing village of Agbegikrom on the river's opposite bank is visible (center, right). Canoes like these were used to ferry people across the river and for fishing. The mountain in the background (looking northward) is the site where the Bui Dam was built, beginning in 2008. Bui Dam settlement, June, 1994.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation; Dam Site
Subjects Facet:
Bui Dam (Ghana); Canoes; Riparian forests; Black Volta River; Fishing
Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here a road is being constructed along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here the river channel has been diverted and the base of the dam is under construction. View from the south bank, looking northwest. Two photos. Bui Dam site, 7 July, 2009.
Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here a road is being constructed along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here they grate the southern mountain that will serve as part of the dam's infrastructure. To the left, the cleared site of the former Ewe fishing village of Agbegikrom is visible. Looking downstream, the braiding of the Black Volta River below the dam site is visible. Bui Dam site, 7 July, 2009.
Sinohydro, a state-owned Chinese hydropower engineering and construction company, began construction on the Bui Hydroelectric Dam in 2008. Here on the north bank of the Black Volta River at the base of the mountain which became the dam site is an Ewe fishing village, Agbegikrom. The village was leveled after its inhabitants were resettled. Two views, one showing a road under construction along the south bank of the Black Volta River at the dam site. Bui Dam site, 28 June, 2008.
Bui Dam was built by Sinohydro, a state-owned Chinese hydropower engineering and construction company. Construction was begun in 2008 and the first turbines became operational in 2013. Here the dam is viewed looking northwest from the newly constructed bridge downstream. Reduced downstream flow of the Black Volta River has exposed the river's rocky bed. Bui Dam site, 18 June, 2016.
The Bui Hydroelectric Dam reduced the Black Volta River's downstream flow, exposing here the rocky river bed that was once home to a braided river channel. Fishing is no longer viable in these downstream areas. Here the river is viewed (looking southeast) from the newly constructed bridge that crosses the Black Volta River, a short distance downstream from the dam. Bui Dam site, 18 June, 2016.
In the foreground, right, work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Grating of the mountain slope is underway. Beyond that (right center) buildings associated with the Chinese operational site are visible. The braided channel of the Black Volta River downstream from the dam site is center frame. Bui Dam site, 7 July, 2009.
Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here standing on the south bank looking northwest with a view of the diversion channel and the base of the dam under construction. The Bui National Park lands in the background were flooded by Bui Lake as it formed behind the dam from 2012. Bui Dam site, 7 July, 2009.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Sinohydro; Bui National Park; Savanna woodland; Vegetation
Subjects Facet:
Bui Dam (Ghana); Landscapes; Black Volta River; Mountains
Canoes belonging to Ewe fishing communities rest on the south bank of the Black Volta River near the Bui Dam site. Prior to the construction of Bui Dam, these canoes were used to ferry passengers between the north and south banks of the river and for fishing. Opposite, riparian woodland lines the river's north bank. Dam Site settlement, December, 1982.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Dam Site
Subjects Facet:
Bui Dam (Ghana); Canoes; Riparian forests; Black Volta River; Ewe (African people)
A canoe belonging to an Ewe fishing community rests on the south bank of the Black Volta River near the Bui Dam site. Prior to the construction of Bui Dam, these canoes were used to ferry passengers between the north and south banks of the river and for fishing. Opposite, a path leads to the Ewe fishing community of Agbegikrom. The mountain behind formed part of the gorge where the Bui Dam was later built (from 2008). Dam Site settlement, 1990.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Dam Site
Subjects Facet:
Bui Dam (Ghana); Canoes; Black Volta River; Mountains; Ewe (African people)
The Black Volta River passes through a gorge in the Banda hills near Bui. This is the site where the Bui Dam was built with construction beginning in 2008. View from a canoe, mid river, looking west. Bui Dam site, 1990.
At the Bui Dam site a path through riparian forest leading to the Black Volta River is lined with water level measurement poles. These were placed when Soviet engineers began construction of the dam under Nkrumah's government. Ann Stahl stands in white pants. Bui Dam site, 1990.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Location(s) Facet:
Dam Site
Subjects:
Vegetation
Subjects Facet:
Bui Dam (Ghana); Riparian forests; Black Volta River
The Ewe fishermen who supplied local and regional markets with freshwater fish from the Black Volta River traveled in locally made wooden canoes. Several are moored on the south bank of the river near the Dam Site settlement, a short distance downstream from the projected site of the Bui Dam. Dam Site, 7 October, 1982.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Date:
1982-10-07
Location(s) Facet:
Dam Site
Subjects:
Dam Site
Subjects Facet:
Fishing; Canoes; Ewe (African people); Black Volta River; Rivers
The Bui Hydroelectric Dam was built on the Black Volta River by Sinohydro, a state-owned Chinese hydropower engineering and construction company. Construction was begun in 2008 and the first turbines became operational in 2013. Here the dam is viewed looking to the northwest from the newly constructed bridge downstream from the dam. Bui Dam site, 20 June, 2019.