1. Downstream from Bui Dam construction site, 2009
- Description:
- In the foreground, right, work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Grating of the mountain slope is underway. Beyond that (right center) buildings associated with the Chinese operational site are visible. The braided channel of the Black Volta River downstream from the dam site is center frame. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17039 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17049
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Landscapes; Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre:
- Digital image
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098