1. Bui Dam, 2016
- Description:
- Bui Dam was built by Sinohydro, a state-owned Chinese hydropower engineering and construction company. Construction was begun in 2008 and the first turbines became operational in 2013. Here the dam is viewed looking northwest from the newly constructed bridge downstream. Reduced downstream flow of the Black Volta River has exposed the river's rocky bed. Bui Dam site, 18 June, 2016.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-16967 ; https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17006
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2016
- Date searchable:
- 2016-06-18
- Genre:
- Digital image
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.179543, -2.371213
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.179543, -2.371213