1. Construction at the Bui Dam site, 2009
- Description:
- Work in progress at the Bui Dam site by Sinohydro, a state-owned Chinese hydropower and engineering company. Here the river channel has been diverted and the base of the dam is under construction. View from the south bank, looking northwest. Two photos. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Dam Site
- Subjects:
- Sinohydro
- Subjects Facet:
- Black Volta River; Bui Dam (Ghana)
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre:
- ;Digital image
- Genre Facet:
- Digital image
- Location(s):
- Dam Site;8.279095, -2.236098
- People Facet:
- Dr. Ann B. Stahl
- Geographic Coordinates:
- 8.279095, -2.236098