1 - 3 of 3
Number of results to display per page
Search Results
1. Temporary bridge over Black Volta River, Bui Dam site, 2009
- Description:
- A temporary bridge spans the Black Volta River at the site where Sinohydro, a state-owned Chinese hydropower engineering and construction company began constructing the Bui Hydroelectric Dam in 2008. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Bui
- Subjects:
- Sinohydro; Savanna woodland; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Bridges; Black Volta River; Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre:
- Digital image
- Genre Facet:
- Digital image
- Location(s):
- Bui;8.279095, -2.236098
- Geographic Coordinates:
- 8.279095, -2.236098
2. Bui Dam in construction, 2009
- Description:
- Sinohydro, the state-owned Chinese hydropower engineering and construction company, began constructing the Bui Hydroelectric Dam in 2008. Here the river's course has been diverted along the south bank as construction of the dam is underway. The land in the background lays within Bui National Park, a Wildlife Protection Area first established in 1971. Following completion of the dam, the area between the dam and the distant mountain was flooded by the newly formed Bui Lake. Viewing the scene, L-R, are Enoch Mensah, Devin Tepleski, unknown dam employeee, Ann B. Stahl and Sampson Attah. Bui Dam site, 7 June, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Location(s) Facet:
- Bui
- Subjects:
- Bui Lake; Bui National Park; Savanna woodland; Sinohydro; Vegetation
- Subjects Facet:
- Bui Dam (Ghana); Landscapes; Mountains; Wildlife refuges
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Genre:
- Digital image
- Genre Facet:
- Digital image
- Location(s):
- Bui;8.277680, -2.236693
- Geographic Coordinates:
- 8.277680, -2.236693
3. Former village site of Agbegikrom, 2009
- Description:
- Sinohydro, the state-owned Chinese hydropower engineering and construction company, began constructing the Bui Hydroelectric Dam in 2008. Here on the north bank of the Black Volta River at the base of the mountain is the cleared site of an Ewe fishing village, Agbegikrom (two views). The village was leveled after its inhabitants were resettled. Bui Dam site, 7 July, 2009.
- Rights:
- Creative Commons Attribution-NonCommercial
- Publisher:
- University of Victoria Libraries
- Relation:
- https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17286
- Location(s) Facet:
- Bui
- Subjects:
- Vegetation; Sinohydro; Savanna woodland
- Subjects Facet:
- Ewe (African people); Black Volta River; Fishing villages; Bui Dam (Ghana); Mountains
- Creator:
- Dr. Ann B. Stahl
- Contributors:
- Dr. Ann B. Stahl
- Date searchable:
- 2009
- Date searchable:
- 2009-07-07
- Location(s):
- Bui;8.279095, -2.236098
- Geographic Coordinates:
- 8.279095, -2.236098