An aerial view of Banda area settlements and roads, looking southwards from the north side of Banda-Ahenkro, district administrative center since 2012 of the Banda District in Ghana's Bono (formerly Brong-Ahafo) Region. The linear range of Banda hills is visible in the background (right, top) with the compact core of Banda-Ahenkro center photo. To the west (right), Ahenkro's houses are more dispersed than in its compact and older core. The left-hand fork of a Y-shaped road (center photo) is the main road that leads south towards Sabiye and Bofie to Menji. The right-hand fork is the now-bypassed old main road between Ahenkro and Kabruno. The road that extends horizontally across the left side of the photo is the paved road that extends from the Banda junction to the Wenchi-Bamboi road (N12). The clustered villages visible south of Ahenkro include Kanka, Kabruno, Sase, Gbao, Dompofie and Makala. To the east of Ahenkro (photo's far left) the angular straight edges and lighter green color of a cashew plantation stand out from the surrounding vegetation. Cashew has become an increasingly important cash crop grown in the area since the early 2000s. Ahenkro, 25 June, 2019.
The road leading from Ahenkro to Bongase parallels the Banda hills. Visible on the right side of the road are electrical lines and a pole. Electrification was recent at the time of these two photos. North of Ahenkro, 16 June, 2009.
The road leading from Ahenkro to Bongase parallels the Banda hills. Visible on the far right (center) is an electrical pole. Electrification was recent at the time of this picture. The mountains near Jama on the north side of the Black Volta River are visible, center. North of Ahenkro, 16 June, 2009.
View to the north on the Bongase road, roughly 4 km southwest of Bongase. Electrical poles and wires run alongside the main road. The low-lying area of the road (ahead in the picture) was inundated by flood waters as the lake formed behind Bui Dam after 2013. A bypass had to be constructed and the road here became passable after the 2013 formation of Bui Lake only by a narrow foot bridge. June, 2009.
Recently paved road connecting Ahenkro with the Wenchi-Bamboi road (N12) via Kanka. Photo taken in-between Nyire and the Kanka traffic circle leading to Ahenkro. 9 July, 2011.
View to the south on the old Bongase road, Banda hills to the right, roughly 3 km southwest of Bongase. The low area (ahead in the road) was inundated by flood waters as the lake formed behind Bui Dam after 2012. A bypass has been constructed and the road here now passable only by a narrow foot bridge. 18 June, 2016.
View to the south on the Bongase road, roughly 1.7 km west of Bongase. The peak known as 'Chuli' is visible in mountain range to the right. 12 June, 2009.
View to the south on the Bongase road, roughly 3 km southwest of Bongase, with Banda hills visible to the right. The low area (ahead in the road) was inundated by flood waters as the lake formed behind Bui Dam after 2013. A bypass had to be constructed as this road became passable only by a narrow foot bridge. 12 June, 2009.