Improving African Futures Using Lessons from the Past

Former village site of Agbegikrom, 2009


Description:
Sinohydro, the state-owned Chinese hydropower engineering and construction company, began constructing the Bui Hydroelectric Dam in 2008. Here on the north bank of the Black Volta River at the base of the mountain is the cleared site of an Ewe fishing village, Agbegikrom (two views). The village was leveled after its inhabitants were resettled. Bui Dam site, 7 July, 2009.
Rights:
Creative Commons Attribution-NonCommercial
Publisher:
University of Victoria Libraries
Relation:
https://exhibits.library.uvic.ca/spotlight/iaff/catalog/17-17286
Location(s) Facet:
Bui
Subjects:
Vegetation; Sinohydro; Savanna woodland
Subjects Facet:
Ewe (African people); Black Volta River; Fishing villages; Bui Dam (Ghana); Mountains
Creator:
Dr. Ann B. Stahl
Contributors:
Dr. Ann B. Stahl
Date searchable:
2009
Date searchable:
2009-07-07
Location(s):
Bui;8.279095, -2.236098
People Facet:
Dr. Ann B. Stahl
Geographic Coordinates:
8.279095, -2.236098